xGRIDx

Platform / 10

Your load is an asset. Run it like one.

Energy Flexibility turns a facility's power use into something that earns: flexible load shifted to cheaper hours, demand response when the grid calls, sites aggregated into a virtual power plant, and rates and programs optimized year round. All of it run from the twin that already holds the site's electrical truth.

Energy Flexibility: in developmentInterconnection packages: open now
Rooftop power and compute equipment above a Houston skyline at golden hour

The four moves

Where it stands

Live today: the twin's electrical record, and SI Power Engineering interconnection packages generated from it. In development: flexibility dispatch, aggregation, and program enrollment, being built with utility and market partners.

We say plainly which is which. Pilot facilities join the development program first, and their flexibility is measured on the twin before anything is bid.

Why from the twin

Flexibility fails when it guesses. A program that curtails the wrong load costs more than it pays. The twin holds the load profile, the equipment, and the operating constraints of the site, so what can move, what can pause, and what can never stop is settled on the record before a single kilowatt is offered.

What it pays

Lower bills from load shifted to cheaper hours. Payments from demand response and aggregation. Both reported monthly in the Facility Room, next to the energy they came from, so the value is a line item and not a claim.

Who it fits / Three shapes

Any site with a meter and a schedule.

Plants and terminals

Big, schedulable loads: compressors, pumps, refrigeration, batch processes. Flexibility measured in megawatts, priced like it.

Buildings and venues

HVAC, lighting, and event schedules that already move with the day. Comfort protected, peaks shaved, programs enrolled.

Portfolios

One facility is a participant. A portfolio is a power plant: aggregated, dispatched, and settled as one resource.

Keep reading

Start / One door

Bring us the bill.

Start with one month of power bills and the twin of one site. We will show you what the load can earn before anyone commits to a program.

Start a conversation